
Solid waste
Law:Hazardous waste disposal.
Internal control indicators:Hazardous waste disposal rage 100%.
Improvement measure:Strengthen overal utilization of resource.

Water waste
Law:COD≤60mg/L,oil≤5mg/L
Internal control indicators:No let out
Improvement measure:Do water sycle project,reduce new water using.

Comprehensive energy consumption per ton of steel
Law:
Internal control indicators:555
Improvement measure:Reduce energy consumption

Radioactive element inspection
Law:Radioactive element inspection.
Internal control indicators:≤0.04Bq/c㎡
Improvement measure:Hanging radioactive signs.

Flue gas
Law:≤50mg/m³
Internal control indicators:Steel making dust concentration≤15mg/m³,sintering≤45mg/m³
Improvement measure:Professional control of dust removing plant

Noise
Law:Day≤65dB(A)、Night≤55dB(A)
Improvement measure:Strengthen process management

Mass loss rate
Law:
Internal control indicators:No more than 1.8/10000
Improvement measure:Install online detector.

Safety production
Hidden danger:1.Possibility of equipment aging. 2.Employees lax safety awareness.
Measuring method:Research lastest safety management method
Improvement measure:Make energy conservation plan and check.

Occupational health
Hidden danger:Element and noise
Internal control indicators:Collect employees' opinion and ask hospital
<span style="color: rgb(229, 51, 51);" white-space:normal;background-color:#ffffff;"="">Improvement measure:Health lecture, physical examination every year.